New Carrollton station

New Carrollton station is a joint Washington Metro, MARC, and Amtrak station just outside the city limits of New Carrollton, Prince George's County, Maryland located at the eastern end of the Metro's Orange Line. The station will also serve as the eastern terminus of the Purple Line, currently under construction, and is adjacent to the Capital Beltway.

New Carrollton
Amtrak
A Metro train at New Carrollton station in May 2010
General information
Location4500 Garden City Drive
New Carrollton, Maryland
United States
Coordinates38°56′53″N 76°52′19″W / 38.9480°N 76.8719°W / 38.9480; -76.8719
Owned byWashington Metropolitan Area Transit Authority, Amtrak
Line(s)Amtrak Northeast Corridor
Platforms2 island platforms (1 for each service)
Tracks2 (Washington Metro)
3 (Amtrak/MARC)
Connections
Construction
Structure typeAt-grade
Parking3,519 spaces
Bicycle facilities18 racks, 16 lockers
AccessibleYes[1]
Other information
Station codeAmtrak: NCR
Metro: D13
IATA codeZRZ
History
OpenedNovember 20, 1978 (1978-11-20) (Metro)
October 30, 1983 (1983-10-30) (Amtrak and Conrail)
Passengers
20221,100 daily[2] (Metro)
Rank70th (Metro)
FY 2022169,699 annually[3] (Amtrak)
Services
Preceding station AmtrakFollowing station
Washington, D.C.Northeast RegionalBWI Airport
Washington, D.C.
One-way operation
PalmettoBWI Airport
toward New York
Washington, D.C.
Terminus
VermonterBWI Airport
toward St. Albans
     Acela does not stop here
     Cardinal does not stop here
     Carolinian does not stop here
     Crescent does not stop here
     Silver Meteor does not stop here
     Silver Star does not stop here
Preceding station MARCFollowing station
Union Station
Terminus
Penn LineSeabrook
towards Perryville
Preceding station Washington MetroFollowing station
Landover
toward Vienna
Orange LineTerminus
Former services
Preceding station AmtrakFollowing station
Washington, D.C.
toward Tri-State
HilltopperBWI Airport
Preceding stationConrailFollowing station
Union Station
Terminus
Baltimore-Washington
Replaced by Penn Line in 1984
Seabrook
toward Baltimore
Preceding station Washington MetroFollowing station
Landover
toward Huntington
Blue LineTerminus
Future services
Preceding station Maryland Transit AdministrationFollowing station
Glenridge
toward Bethesda
Purple LineTerminus
Location
Map

Beneath the Metro station platform, a waiting room serves Amtrak's Northeast Regional, Vermonter, and Palmetto trains, as well as MARC's Penn Line trains. The New Carrollton Rail Yard is nearby.

Greyhound, a nationwide intercity bus company, also stops at the station on routes serving Richmond, Washington, Philadelphia, New York City, Pittsburgh, and points beyond.[4]

History

edit

The New Carrollton station is the third station in the area to serve rail traffic.

The first station, Lanham, 0.75 miles (1.21 km) north of the current station, opened in the 1870s. By the late 1960s, it consisted of a small shelter and an asphalt platform served by a few Penn Central (later Conrail) commuter trains between Washington and Baltimore.

Metroliner at Capital Beltway in 1974.

The second, Capital Beltway station, sat just inside the Capital Beltway. Opened on March 16, 1970, it was served by Penn Central (later Amtrak) Metroliners.[5][6]

On November 20, 1978, the Washington Metro opened its New Carrollton station, along with the Cheverly, Deanwood, Landover, and Minnesota Avenue stations, marking the completion of 7.4 miles (11.9 km) of Metro track northeast from the Stadium–Armory station.[7][8][9]

In August 1982, Conrail commuter trains (later AMDOT, then the MARC Penn Line) began stopping at Capital Beltway, replacing stops at Lanham and Landover.[10] On October 30, 1983, Amtrak and AMDOT moved from Capital Beltway to a new island platform and waiting room at New Carrollton station.[5][11][12]

Until 2003, some Acela Express trains stopped at New Carrollton. In October 2015, the Palmetto began stopping in New Carrollton.

In May 2018, Metro announced an extensive renovation of platforms at twenty stations across the system.[13] The Metro station was closed from May 28, 2022 to September 5, 2022, as part of the summer Platform Improvement Project, which also affected stations north of Stadium-Armory on the Orange Line. Shuttle buses and free parking were provided at the closed stations.[14]

On September 10, 2022, Blue Line trains started serving the station due to the 14th Street bridge shutdown as a part of the Blue Plus service.[15] The service ended on May 7, 2023 with the reopening of the Yellow Line.[16]

The Purple Line light rail system will begin at New Carrollton and run west to Bethesda. The line will connect to Washington Metro stations on the Red and Green lines. The system is under construction as of 2022 and is scheduled to open in 2027.[17][18]

Station layout

edit
Amtrak/MARC platform

At New Carrollton, the Northeast Corridor consists of three tracks. The westernmost two tracks (Tracks 2 and 3) have an island platform between them, with Track 1 having no platform. To the east of the Amtrak platform is the Metro platform, serving the Orange Line. Bus loops and parking lots are located on both sides of the rail line.

The station has entrances at Harkins Road and Ellin Road, and Garden City Drive near U.S. Route 50, and Exit 19 on Interstate 495.

Long-term plans for the New Carrollton station include adding a second island platform (providing access to Track 1) and adding a fourth track.[19]

References

edit
edit
Purple Line
Bethesda
Connecticut Avenue
Lyttonsville
16th Street–Woodside
Silver Spring
Bonifant Street
Silver Spring Library
Wayne Avenue
Dale Drive
Manchester Place
Long Branch
MD 193
University Boulevard
Piney Branch Road
Takoma Langley
Riggs Road
Adelphi Road–UMGC–UMD
Campus Drive–UMD
Campus Drive
Baltimore Avenue–UMD
College Park–University of Maryland
Riverdale Park North–UMD
MD 201
Kenilworth Avenue
Riverdale Park–Kenilworth
Beacon Heights–East Pines
Glenridge Maintenance Facility
Glenridge
Ellin Road
New Carrollton

All stations are accessible